PinLabelPinLabel
Home / Knowledge Base / Electrical & Appliances / Will Malaysia Accept Your Overseas Test Report? ST's Six Recognised Routes

Will Malaysia Accept Your Overseas Test Report? ST's Six Recognised Routes

Electrical & Appliances · 2026-11-07 · PinLabel Compliance Team
Will Malaysia Accept Your Overseas Test Report? ST's Six Recognised Routes
🔀Import vs local: the rules differ — Manufacturer and importer follow different clauses. A local manufacturer (Regulation 97D) submits a test report from a laboratory ACCREDITED by the accreditation authority, or a Certificate of Conformity from a LOCAL conformity assessment body, and must join SIRIM's Product Certification Scheme. An importer (Regulation 97E) submits a test report from a laboratory RECOGNISED by the Commission, or a Certificate of Conformity from a FOREIGN conformity assessment body recognised under Regulation 97A, and must pass a SIRIM consignment test on each batch or join the PCS. Imported equipment must also be built with a power supply cord and plug meeting Malaysian requirements.

Your product already passed a CE, UL or JIS test overseas. Does Malaysia make you test it all over again?

The short answer: no — if the report comes from one of six recognised routes, and it still sits inside the validity window. But a recognised report is not the finish line. The Energy Commission (Suruhanjaya Tenaga, ST) can still ask for more testing, your plug almost certainly has to change, and the first shipment faces a separate consignment test.

This article works through exactly what ST's own guideline says, so you can tell before you spend money whether the report in your hand is usable.

This is a pre-screening overview, not a compliance guarantee. Requirements change; verify against the current guideline before you commit a shipment.

Which document actually governs this

The rules sit in the Guideline for Approval of Electrical Equipment, GP/ST/No.14/2017, Sixth Edition (2018), issued by the Energy Commission under Section 50C of the Electricity Supply Act 1990 [Act 447], operating under the Electricity Regulations 1994.

That guideline is the document an ST officer works from. If a consultant tells you something different, ask which clause.

The six routes ST recognises

When ST evaluates your Certificate of Approval (CoA) application, the guideline states it assesses the validity of the type test report against these sources:

Route What it means
SIRIM QAS Malaysia's own testing and certification body
Labs under SAMM by DSM Accredited under the Department of Standards Malaysia's SAMM scheme
Labs under the IECEE CB Scheme Your CB test report and CB certificate
Labs accredited by APLAC MRA Asia Pacific regional accreditation
Labs accredited by ILAC MRA International accreditation
Labs listed under the ASEAN EE MRA The ASEAN electrical/electronic sectoral arrangement

The guideline adds a note of its own: DSM is itself an APLAC/ILAC MRA signatory.

The practical reading: if your test house is ILAC-accredited for the relevant standard — which covers most reputable laboratories in Taiwan, Japan, Korea, the EU and the US — the report is in scope. A CB test report is explicitly named, so the IECEE route is the cleanest if you already run it.

One more formal requirement that trips up Japanese and Korean suppliers: the test report must be in English or Malay. A report in Japanese with an unofficial translation attached is not what the guideline asks for.

The validity window — two numbers, both easy to miss

This is where otherwise-fine applications get rejected.

A test report shall be valid for not less than one year and not exceeding five years from the date of the report (Regulation 97D(2) for manufacturers, 97E(2) for importers).

A Certificate of Conformity, if you go that route instead, is valid for not less than one year and not exceeding three years from the date of the certificate.

Then the clause people actually miss — 97D(5) and 97E(5):

the manufacturer / importer shall ensure that such test report or Certificate of Conformity has a validity period of not less than one year before the expiry date.

Read that twice. It is not enough that the report has not expired. At the moment you apply, it must still have at least one year left. A report with ten months of life is treated as unusable.

So the usable window is roughly years one through four of a five-year report. If your supplier's report is four and a half years old, you are retesting — plan for it rather than discovering it at submission.

When a report or certificate does expire, 97D(4) / 97E(4) require you to submit a new one. There is no grace extension.

Manufacturer and importer are not the same route

The guideline splits these deliberately, and the wording differs in a way that matters.

If you manufacture in Malaysia (Regulation 97D) you submit either a test report on conformity with safety standards recognised by the Commission, or a Certificate of Conformity issued by a local conformity assessment body. The test report must come from a laboratory accredited by the accreditation authority.

If you import (Regulation 97E) you submit either a test report, or a Certificate of Conformity issued by a foreign conformity assessment body recognised by the Commission under Regulation 97A. Here the test report must come from a laboratory recognised by the Commission — recognised, not merely accredited.

That distinction is the single most common misreading. "My lab is ILAC-accredited" answers the manufacturer-route question. On the importer route the operative test is whether the Commission recognises it.

Regulation 97A sets the condition for recognising a foreign conformity assessment body: it must be recognised, registered or licensed by the relevant authority in the country where it operates, and ST ceases to recognise it if that home-country authorisation is revoked.

Recognition does not mean "no further testing"

Regulation 97A(3) is the clause to read before you assume you are done:

All test reports, certificates, records or technical files produced by a foreign conformity assessment body in accordance with these Regulations shall be recognised as valid and subsisting for the purposes of this Part, without prejudice to any further testing or assessment to be done to them as the Commission deems [fit].

Your report is accepted as genuine. ST keeps the right to require more. Budget for the possibility instead of treating acceptance as final.

Two predictable reasons it gets exercised:

National deviations. Malaysia applies national deviations to adopted standards, set out in Chapter 8 of the guideline. A CB report written to the plain IEC standard may not cover them.

Plugs and cords. The guideline is explicit for importers: equipment shall be constructed with power supply cord and power plug which comply with Malaysian requirements and standards. Malaysia uses the BS 1363 three-pin plug. A product tested and certified perfectly with a Schuko or a Type A plug still needs its cord set changed and evidenced.

After the CoA: the part people forget to budget

Approval is not the end of testing.

Manufacturers must participate in SIRIM's Product Certification Scheme (PCS), and the equipment carries a SIRIM-issued label or the SIRIM Certification Mark.

Importers must either pass a SIRIM consignment test for each batch, or participate in SIRIM's PCS within the CoA validity period. Equipment likewise carries SIRIM labels or the Mark.

And the consequence worth pricing in before your first container: equipment that fails the consignment test must be sent back to the country of origin or destroyed. There is no reworking it at the port.

Fees and renewal

The guideline states an annual fee of RM220 for single phase and RM330 for three phase, payable on approval of the CoA, under Second Schedule, Part XIII, Regulation 97(4) of the Electricity (Amendment) Regulations 2014. Registering as a manufacturer or importer carries a RM30 process fee.

Certificates of Registration to manufacture or import are valid not less than one year and not exceeding five years. Renewal of a CoA shall be made not less than 14 days before its expiry date, under Regulation 106 of the Electricity Regulations 1994. Miss that window and you are re-applying, not renewing — while your goods sit.

Keep the paperwork longer than you think

Regulation 97F sets retention periods that outlast most product lifecycles:

  • Manufacturers and importers: all files, with the test report or Certificate of Conformity, for not less than ten years after the last unit left the production line
  • Testing laboratories: technical files for not less than six years after the report expires
  • Local conformity assessment bodies: files for not less than six years after the Certificate of Conformity expires

If you change local importer partway through a product's life, make the file handover an explicit contract term. Ten years is long enough that nobody remembers informally.

A five-minute self-check before you spend anything

  1. Is the test house SIRIM QAS, SAMM/DSM, IECEE CB, APLAC MRA, ILAC MRA, or ASEAN EE MRA listed?
  2. Is the report in English or Malay?
  3. Is the report dated inside the last four years — leaving a full year of validity?
  4. Are you on the importer route? Then check Commission recognition, not just accreditation.
  5. Does the test cover Malaysia's national deviations?
  6. Does the product ship with a BS 1363 plug and a compliant cord?
  7. Have you budgeted for consignment testing on every batch, or PCS participation?

Fail any of 1–3 and you are retesting. Fail 6 and you are changing the cord set. Both are far cheaper to find now.

Frequently Asked Questions (FAQ)

Q: Does a CE mark get my product approved in Malaysia? No. CE is a self-declaration regime and is not a Malaysian approval. What is usable is the underlying test report, if it came from a laboratory under one of the six recognised routes and is in English or Malay.

Q: My CB test report is three years old. Can I still use it? Yes, on the face of the clauses. A test report may be valid up to five years from its date, and you must have at least one year of validity remaining when you submit. A three-year-old report satisfies both.

Q: Do I need to retest in Malaysia if I already have an ILAC-accredited report? Not automatically. But Regulation 97A(3) preserves the Commission's right to require further testing or assessment, and national deviations plus Malaysian plug and cord requirements are the usual reasons it does.

Q: Who should hold the Certificate of Approval — my company or the Malaysian importer? The guideline runs separate registration and submission routes for manufacturers (Regulation 97D) and importers (Regulation 97E). Which applies depends on who is placing the equipment on the Malaysian market. Decide this before you apply; it is tied to the registration you hold.

Q: What happens if a shipment fails the SIRIM consignment test? It must be returned to the country of origin or destroyed. There is no option to rework it locally.

Q: How long does a Certificate of Approval last? Pay the annual fee on approval, and renew not less than 14 days before the expiry date under Regulation 106. Registrations to manufacture or import run up to five years.

Before your artwork goes to print

A recognised test report gets the product through approval. The label is a separate failure point — the SIRIM mark, the required particulars, type sizes, and the language rules all have to be right on the artwork itself.

Run your draft through our free label check before the print run. It takes a couple of minutes and flags the particulars that most often come back from the market.

Related reading: Malaysia's regulated electrical equipment list · ST and SIRIM certification: the full guide · The ST-SIRIM label itself

📚 Sources / official references

  1. Guideline for Approval of Electrical Equipment, GP/ST/No.14/2017, Sixth Edition (2018) — Energy Commission (Suruhanjaya Tenaga)
  2. Suruhanjaya Tenaga (Energy Commission, Malaysia)
  3. SIRIM QAS International — electrical product certification

This article is compiled from the official sources above for reference only; actual compliance is subject to the authorities' latest regulations and review.

Find out what your label is missing

Free label check →